Optimize Equipment Startup, Shutdown, and Operating Limits
An owner-operator wishes to optimize the startup and shutdown procedures for a hydroprocessing reactor that is susceptible to hydrogen embrittlement and temper embrittlement damage mechanisms that may increase propensity for brittle fracture.
Required Thickness Limits
An owner-operator wishes to establish minimum required thickness limits for thickness monitoring locations (TML) or condition monitoring locations (CML) because current minimum measured thickness values reflect loss in excess of the original design corrosion allowance for the component.
Post Weld Heat Treatment Plans
An owner-operator intends to perform a repair or alteration on a pressure vessel that will require post weld heat treatment (PWHT). The owner-operator must ensure that the PWHT operation will not result in distortion, buckling, and/or excessive residual stresses.